Modernist Discipline: PARKSEOBO MUSEUM | Choi Moongyu + Ga.A Architects

Choi Moongyu + Ga.A Architects

written by
Choi Moongyu
photographed by
Namgoong Sun (unless otherwise indicated)
materials provided by
Ga.A Architects
edited by
Bang Yukyung
background

SPACE September 2026 (No. 706) 

 

 

 

A Museum in a Residential Neighbourhood

PARKSEOBO MUSEUM consists of six independent galleries designed to accommodate a variety of exhibitions, across two basement levels and three floors above ground. GIZI_Art Base (covered in SPACE No. 622), previously designed by BCHO Partners, was set back 4m from the road to create a small garden in front. The new PARKSEOBO MUSEUM was positioned with the same setback, transforming what had been a confined streetscape into a brighter and more open one. The corners of the building were opened to preserve daylight and views for the neighbouring houses on either side, while the first floor was designed to be transparent, allowing the exhibitions and activities within to be visible from outside.

 

 

 

 

 

 

 

Different Spaces Awaiting Imagination

To accommodate the works of Park Seo-Bo, who pursued the new throughout his life, as well as a wide range of works by other artists, the galleries were designed with varying dimensions and ceiling heights. This allows them to flexibly accommodate exhibitions of different kinds, including painting, installation, and new media art. The diversity of these spaces elaborates on Park Seo-Bo’s approach to art – one that resisted being fixed to any particular form and continually pursued change and experimentation – into architecture. The basement levels are constructed in reinforced concrete, while a steel structure is used above ground, eliminating columns within the galleries. On the third floor, an 8×8×8m cube gallery was conceived as a platform for a variety of works that could not be installed in smaller spaces. Each gallery connects to a small yet richly conceived outdoor space: a narrow, elongated garden at basement level; a garden opening to the north on the first floor; and, on the third floor, an outdoor exhibition space opening toward the slopes of Ansan Mountain. 

 

 

 

 

 

 

 

Sketch 

 

Sketch 

 

Sketch 

 

 

 

Design development stage, 3F plan

The basement of the PARKSEOBO MUSEUM is built with a reinforced concrete structure, while the storeys above are built with a steel structure. The first floor is supported by CFT columns – which are thinner than the concrete columns below – allowing for a glass façade set back inwards. To create a column-free exhibition space, the second floor was conceived as a cantilevered box. On the third floor, the cube gallery was designed as an independent steel mass resting atop the second floor to reflect its identity as an experimental exhibition space. To project this mass beyond the building line of the floor below, the third-floor cube gallery’s floor level was raised by the thickness of the steel slab. To resolve this inside, the floor levels were connected via ramps and stairs. A method for connecting the steel elements horizontally and vertically to secure the cube gallery to the main building was also considered. The cross-section (p. 58) and floor plan (p. 59) are intermediate drawings exchanged with structural engineers to address these structural challenges.

 

 

 

 

 

 

You can see more information on the SPACE No. September (2026).

Architect

Choi Moongyu (Yonsei University) + Ga.A Architects (Koh Daegon)

Design team

Song Bongki, Roh Jinwoo, Seo Hyunmin, Mun Juhui, Jeong Changhwa, Kim Sanghyun, Jang Yerim, Park Dongmin

Location

79-41, Yeonhui-dong, Seodaemun-gu, Seoul, Korea (and 2 other lots)

Programme

neighbourhood living facility

Site area

782.92m²

Building area

428.57m²

Gross floor area

1,999.69m²

Building scope

B2, 3F

Parking

12

Height

18.77m

Building to land ratio

54.74%

Floor area ratio

132.8%

Structure

RC, steel frame

Exterior finishing

patina copper, exposed concrete with a pine finish

Interior finishing

exposed concrete with a pine finish, concrete poli

Structural engineer

EUN Structure Engineers Co.,Ltd.

Mechanical engineer

SEOIN MEC Co., Ltd.

Electrical engineer

Sungji ENC Co., Ltd.

Construction

C&O Construction Co., Ltd.

Design period

Aug. 2022–Mar. 2024

Construction period

Aug. 2023–Apr. 2026

Client

PARKSEOBO FOUNDATION

Interior design

KIYUON Architects (Jeong Yunseok, Yang Kiran, Jeon

Landscape architect

PEONY GARDEN


Choi Moongyu
Choi Moongyu obtained B. Arch and Master of Engineering from Yonsei University, and Master of Architecture from Columbia University. Having worked in Toyo Ito Architects and Hanul Architects, he founded Ga.A Architects in 1999. Till August 2026 he was a Professor of Architectural Engineering at Yonsei University.